Real projects for real manufacturers — told plainly, because the results don't need dressing up.
Dehumidifier manufacturer — the problem
Their sales drawing was the heart of every proposal: a pre-engineered package that took two weeks to produce, for products ranging from dishwasher-size to tractor-trailer-size. Two automation contractors had already tried and failed — months of development cost, nothing working.
What changed
BDS rebuilt the project and delivered. Phase one automated their eight most-quoted configurations: two weeks became five minutes. Phase two expanded to 83 base configurations — trillions of possible combinations — with a redesigned interface and a new architecture that cut it to two minutes.
Horse stall manufacturer — the problem
They were about to hire a full-time CAD designer. Two SOLIDWORKS licenses, two owners with limited modeling skills, and every custom stall order waiting on design work.
What changed
We started small: one stall door, billed hourly. It quickly became clear the answer wasn't more CAD hours — it was a configurator. Today every stall product line, plus several others, configures itself. They never made that hire.